GHH Mining Machines — Net Replacement & Structure Repair
Boksburg, Gauteng | 2026
A returning client. The netting over their staff and visitor parking had come to the end of its life — stretched, sagging, and no longer doing much of a job. Before anything new went on, I went over the steel and repaired what needed repairing. Then the old nets came off and new blue netting went on across the full run. Blue is their corporate colour, and it has lifted the whole yard.
- Configuration
- Existing four-post structures — repaired and refitted
- Steel
- Original frames, repaired where needed
- Netting
- Knittex Z25 Blue (full replacement)
- Completed
- 2026
Project photos

Before — the old netting sagging over the staff bays

Before — years of sun had taken the tension out of it

Before — the far run, same story

Before — the visitor bays waiting their turn

Frames stripped back, ready for the new nets

Steel repaired and the bay cleared before refitting

The finished run across the front of the building

Crew tensioning the last of the new netting

New Knittex Z25 Blue over the staff parking

Looking down the completed run

The shadeport against the Komatsu offices

Underneath — tension even across every panel

The full run from the yard

Old netting stripped off and stacked for removal

Four-post shadeport in Knittex Z25 Blue

Wide view of the completed installation
Need something similar?
Send me photos or measurements and I will quote it within a day.
Get a Quote